When was marr college built
The stratified composition and materials of the new Technical Block are designed to minimise the visual mass of the new construction and to make reference to the Marr Building pallet but not to attempt to replicate them, thereby, again presenting the new construction as being subservient to the original building.
Marr College Main Contractor: Kier Group. Photographer: Keith Hunter. Celebrating Our th Product September 14, August 19, Hamlet Trophy Competition July 2, Website Design - Internet Creation. Project details. Brief retain and refurbish a secondary school building which was built in Integrated services architecture, acoustics. Students moved into the new school in October of , and the old school became the property of Shasta County. In , Shasta Junior College was built on land west of the Shasta High School and remained there until a new college was built at a site east of Redding in — the present location of Shasta College.
After 9th grade, the students moved on to Shasta High, Central Valley High built in or Enterprise High built in for grades In , Nova High was closed and the 9th grade students were moved back to the other high schools, which then consisted of grades instead of grades that they had housed since In a new high school, Foothill High School, serving the students in northeast Redding, Palo Cedro, Bella Vista and to the eastern borders of the District was established at the old Nova High campus.
This was to be temporary until the District completed a new high school for these students. In the District office was moved from its downtown location to the Shasta Learning Center. Remodeling of the Learning Center began and included complete window replacements with energy efficient windows, replacement of the roofing with tiles made by the company that supplied original roofing tiles , installation of heating and air conditioning systems, exterior painting and complete remodeling of the auditorium interior.
0コメント